Planning is an important part of many residential architectural projects.
Understanding the planning context of a property at an early stage can help establish what may be achievable and identify potential constraints before significant design work is undertaken.
SMY Architecture provides planning and architectural services for residential projects across London, Essex and Chelmsford, including extensions, loft conversions, renovations, flat conversions and new-build homes.
Every property is different, and the appropriate planning route depends on the property, location, proposed works and relevant planning policies.
We consider the planning history and context of each project and advise on the most appropriate route, which may include:
The exact requirements and limitations vary depending on the property, its planning history and location. Conservation Areas, Article 4 Directions, listed status and previous extensions can also affect whether Permitted Development rights are available.
Where required, we prepare the architectural drawings and information necessary to support the relevant planning application.
This can include:
We can also assist with planning application coordination and responses to planning queries.
Planning permission is not the only approval that may be required before work can begin. Depending on the property and proposed works, additional agreements or consents may include:
Party Wall
The Party Wall etc. Act 1996 may apply where works affect a party wall, boundary or involve certain excavation close to neighbouring buildings.
We can provide the architectural information required to support the Party Wall process and coordinate with a specialist Party Wall Surveyor where appropriate.
Licence to Alter / Freeholder Consent
For leasehold properties, planning permission does not necessarily give you the right to carry out alterations.
A Licence to Alter or other written consent from the freeholder may be required, particularly for flats, structural alterations, extensions or works affecting communal or retained parts of a building.
We can prepare the architectural drawings required to support an application for freeholder consent.
Building Control
Building Control is separate from planning permission and is concerned with how a building is constructed and whether the proposed works comply with the requirements of the Building Regulations.
Planning permission considers matters such as the design, appearance, size and impact of a development, while Building Control focuses on areas including structural safety, fire safety, insulation, ventilation, drainage, energy efficiency and accessibility.
Where required, a Building Regulations application must be made to Building Control before construction begins. Depending on the project, this may be through the Local Authority Building Control service or a Registered Private Building Control.
Planning permission does not automatically provide Building Regulations approval, and both processes should be considered separately.
Building Control Approval & Inspections
Once the application has been submitted, Building Control will review the information and may request amendments or additional technical details.
During construction, Building Control will also carry out inspections at relevant stages to check that the works are being constructed in accordance with the Building Regulations.
The required notice must be given to Building Control before work commences, and the contractor should ensure that the relevant inspection stages are arranged throughout the construction process.
Following satisfactory completion and inspection of the works, Building Control can issue a Completion Certificate, providing confirmation that the relevant Building Regulations requirements have been met.
SMY Architecture can assist with the preparation and coordination of Building Regulations information and work alongside Building Control, contractors and specialist consultants where required.
The level of technical information and professional involvement will depend on the nature, scale and complexity of each project.
Where an extension or new building is proposed over or close to a public sewer, a Build Over Agreement with the relevant water company may be required.
We can identify potential drainage and sewer constraints at an early stage and provide the architectural information required to support the relevant agreement.
